Gas Plant
- 350 MMSCFD Initial Flow – Current Buildout to 500MMSCFD
- Inlet gas separation & metering equipment
- H2S removal equipment (Liquid bed technology)
- Amine treating facility for CO2 & H2S removal
- TEG dehydration units
- Electric drive compression (3 units ~5300 HP each)
- Flare and utilities
- Storage tanks for liquids handling & truck loadout/in facilities

Planning for Scalable Growth and Enhanced Processing
Preparing infrastructure for expanded capacity and advanced treatment systems
We partnered with our client to transform their facility into a high-capacity, future-proof gas processing facility. Through a meticulously executed four-phase expansion, we delivered more than additional throughput — we ensured reliability, versatility, and enduring value. The project included all disciplines and deliverables through all four phases.
- Phase 1 - Building the Foundation: The project scope began with an initial buildout of 350 MMSCFD of processing capacity for H₂S/CO₂ removal and 350 MMSCFD of residue compression powered by two single-stage compressors, establishing a strong and efficient base for a growing facility.
- Phase 2 - Scaling for Growth: As demand increased, the project expanded its scope and increased the facility’s processing capacity to 500 MMSCFD, integrating additional compression and utility upgrades to support seamless, continuous operations.
- Phase 3 - Adding Resilience: A third amine train was installed to initially provide backup capacity and eventually process all gas through the facility for H2S/CO2 Removal. Strategic upgrades, including flare relocation, improved both safety and performance.
- Phase 4 - Future-Ready Operations: This phase ensured all 500 MMSCFD of inlet gas is fully treated for H₂S/CO₂ removal. Advanced enhancements included: H₂S Removal units, a wet screw compressor, vent relocation, and a secondary flare system. These enhancements positioned the facility for safe, reliable, and sustainable operation well into the future.
The final outcome resulted in a fully modernized processing sweet gas facility that not only meets today’s production requirements but is also engineered for tomorrow’s challenges.
Client Benefits:
- Significantly increased processing capacity to meet future production demands
- Streamlined future expansion enabled by pre-planned connection points and infrastructure
- Enhanced treatment capabilities with advanced separation and gas-sweetening systems
- Reduced future capital expenditure and construction disruptions through thoughtful initial design